We document the building progress of your house
From the first cut of the spade to the finished house we document you with pictures the building progress of your new home
Ditch of the water development Ditch of the water development


Measuring Measuring


Mark the single foundations Foundations

Mark the single foundations


single foundations The kind of the foundation depends among other things on the kind of the building ground and its permissible maximum capacity.


ausbaggern Our buildings are usually created with single foundations. They predominantly load as column foundation a smaller building ground surface.


Incapsulation Incapsulation


Einschalung For the reinforced concrete compound unit an a formwork is to be made.

Bewehrung einbringen In the reinforced concrete construction steel and concrete are connected to common effect. One calls the steel thereby the armouring (reinforcing) of the concrete.


Bewerung einbriingen The necessary steel cores are to be prepared and shifted: The steel must be cut after the armouring design, bent possibly and brought into the formwork form.

Beton concrete


Concrete is an artificial stone, which results from a mixture of cement, concrete addition and water from confirming the cement paste (cement water mixture).


ready-mix concrete On the building sites ready-mix concrete is used. It is mixed in the work and brought to the building site. After a confirmation time of one up to several days - depending upon kind of the construction unit,


Betonkern the cement strength class and the temperature - the a formwork removed, only then is visible the stahlbetonkern with its prescribed dimensions.



Bewehrung
Decisive for the stability of a reinforced concrete of construction unit above all the situation of the armouring is beside the concrete strength class and the reinforcing steel places. The stress analyst (Mechanikos) is responsible for the necessary computations of stability and the firmness also for the production of armouring designs, from which the situation of the armouring comes out among other things.

ausmauern


Wärmedämmung

After production of the concrete skeleton the outside wall is provided as clam-shell brick-work with air layer and heat-insulating layer.


roof structure


roofing roofing


electric installation electric installation


external plaster external plaster


windows windows


tiling tiling


wooden beam seiling wooden beam seiling


interior painting interior painting


exterior painting exterior painting


From the first cut of the spade to the introduction into your new house offense approx.. 8-10 months depending upon size of the house